App Logo
Kérdezzen szakértőt

Invest in UAQ: Sobha 2BR Apts | 2028 | From AED 1.4M (HU)

5
Invest in UAQ: Sobha 2BR Apts | 2028 | From AED 1.4M (HU)
Invest in Sobha Aquamont, beachfront 2-bedroom apartments by Sobha in Downtown Umm Al Quwain, starting from AED 1.4M with handover in 2028. (HU)

Discover Sobha Aquamont in UAQ Experience unparalleled beachfront living at Sobha Aquamont, a prestigious development by Sobha located in Downtown Umm Al Quwain. This landmark project offers a serene environment with stunning beachfront views, designed for a tranquil and elevated lifestyle. Unit offerings include 1-bedroom apartments starting from AED 1,112,127, 2-bedroom apartments from AED 1,440,426, and luxurious 3-bedroom duplexes from AED 4,299,967. Each residence features modern finishing with high-quality materials and equipped kitchens. Residents can indulge in a host of amenities such as a Swimming Pool, Ping Pong Table, Kids Play Area, Yoga Deck, BBQ Deck, Outdoor Cinema, and an Outdoor Gym. The flexible payment plan for Sobha Aquamont includes 20% on booking, 40% during construction, and the final 40% upon handover. This exceptional development is scheduled for completion in 2028, promising a harmonious blend of natural beauty and modern amenities. If you're looking for trusted partners on your investment journey, please reach out to us. (HU)

Gyakran Ismételt Kérdések
What types of units are available at Sobha Aquamont and what are their starting prices? (HU)
Sobha Aquamont offers 1-bedroom apartments starting from AED 1,112,127, 2-bedroom apartments from AED 1,440,426, and 3-bedroom duplexes from AED 4,299,967. (HU)
Where is Sobha Aquamont located? (HU)
Sobha Aquamont is located in Downtown Umm Al Quwain. (HU)
What amenities are available at Sobha Aquamont? (HU)
Residents can enjoy a Swimming Pool, Ping Pong Table, Kids Play Area, Yoga Deck, BBQ Deck, Outdoor Cinema, and an Outdoor Gym. (HU)
What is the payment plan for Sobha Aquamont? (HU)
The payment plan for Sobha Aquamont includes 20% on booking, 40% during construction, and the final 40% upon handover. (HU)
When is Sobha Aquamont scheduled for completion? (HU)
Sobha Aquamont is scheduled for completion in 2028. (HU)
Hasznos betekintések, amelyek érdekelhetnek
App Logo
Lépjen kapcsolatba személyes tanácsadójával
Vegye fel a kapcsolatot szakértő tanácsadóinkkal személyre szabott betekintésekért és prémium befektetési ajánlásokért.