App Logo
Kérdezzen szakértőt

V Tower Studios by Tiger Group: Handover 2023 (HU)

5
V Tower Studios by Tiger Group: Handover 2023 (HU)
V Tower by Tiger Group offers fully furnished Studio apartments with a 50/50 payment plan, located in Wadi Al Safa 5, with handover in 2023. (HU)

V Tower: Your Ideal Investment in Wadi Al Safa 5

Discover V Tower, an exceptional residential development by Tiger Group, poised for handover in 2023. Located in the vibrant Wadi Al Safa 5, within the Dubai Residential Complex (DRC) and adjacent to Al Ain Road, V Tower offers a cosmopolitan lifestyle with unparalleled connectivity to key hubs.

The project features a diverse range of meticulously designed apartments, including highly sought-after Studio units, alongside 1, 2, and 3-bedroom apartments, and spacious 3-bedroom duplexes. Each residence comes fully furnished with a fully-equipped kitchen, ensuring a seamless move-in experience.

Residents of V Tower will benefit from a comprehensive array of modern amenities, including a refreshing swimming pool, a state-of-the-art gym, and a dedicated play area for kids. The building also ensures peace of mind with 24-hour security cameras and 24-hour maintenance services.

An attractive payment plan is available, requiring 50% on booking and the remaining 50% upon handover, scheduled for 2023. If you're looking for trusted partners on your investment journey, please reach out to us. (HU)

Gyakran Ismételt Kérdések
What is V Tower and who is the developer? (HU)
V Tower is a residential development by Tiger Group, located in Wadi Al Safa 5. (HU)
What types of units are available at V Tower? (HU)
V Tower offers Studio, 1, 2, and 3-bedroom apartments, and spacious 3-bedroom duplexes, all fully furnished with fully-equipped kitchens. (HU)
What amenities are available to residents at V Tower? (HU)
Residents benefit from a swimming pool, a state-of-the-art gym, a dedicated play area for kids, 24-hour security cameras, and 24-hour maintenance services. (HU)
What is the payment plan for V Tower? (HU)
An attractive payment plan is available, requiring 50% on booking and the remaining 50% upon handover. (HU)
When is V Tower expected to be handed over? (HU)
V Tower is poised for handover in 2023. (HU)
Hasznos betekintések, amelyek érdekelhetnek
App Logo
Lépjen kapcsolatba személyes tanácsadójával
Vegye fel a kapcsolatot szakértő tanácsadóinkkal személyre szabott betekintésekért és prémium befektetési ajánlásokért.